After the survey what happens during repair/renewal work on our premises?

Q. After the survey what happens during repair/renewal work on our premises?

A. Recommendations are given in the survey report.

Back to FAQs

Submenu

ISO 9001:2008 QA

Affiliations


Work Examples

thermal-insulation-residues-to-walls-of-boiler-room thermal-insulation-residues-to-old-heating-pipe-work-to-boiler-room cement-panels-to-roof-of-temporary-demountable-building damaged-asbestos-paper-and-fibreglass-lagging-to-old-heating-pipe-work exposed-sections-of-thermal-lagging-and-cloth-wrap rope-seals-to-roof-skylight-frame-work asbestos-board-to-bulkhead-above-shop-front-and-behind-wood-overboard cement-product-fillets-used-as-undercloak-to-tiled-roof cement-fillet-panels-located-above-steel-beam-work